Refurbishments – Commercial Office

Strip-out, Carpentry, Electrics and Decoration package.

We completely stripped out this office to create a brand new modern workable space.
Speed was important as the Client wanted it completed in 10 days. We met this deadline!


The office required complete rewiring of the electrics, with new power points and spot lights to suit the new layout, we also had to custom build the directors desks and board room table as delivery dates for furniture was outside of the 10 day deadline. We included a new swanky glass office with frosted privacy detail to both the internal office and front windows. Bespoke storage cupboards were built in a very awkward alcove in the rear and  a new fitted kitchenette. The office was painted, both inside and out and final details checked. The Client was very impressed with the result and our commitment to their deadline.


Read More

New Build – Residential Homes

Turnkey – New Build, 2 Executive Semi-Detached Residential Homes.

All building tradesmen were utilised in completing these 2 beautiful executive investment properties, which were built on virgin land.

As the properties were built on an empty plot of land all utilities from the mains supply had to be extended to the land to allow gas, water and electric connections within the properties.  The build included all aspects of sub and super structure works, from foundation and drainage to decoration and finishing touches, all in line with current British Standard requirements. Both, external and internal works, including  Kitchen and bathrooms, were all finished to a very high specification to meet current trends.…

Read More

New Build – 20 Residential Flats – Wanstead

Brickwork, Blockwork and Diamond Drilling package.

This was a 3 facet build as involved the structure of the main block, housing 20 apartments, and a further 2 additional outbuildings for the bike shed and plant room.

The works started from the ground up, with the setting out of the gridlines in readiness for the brick and block work required. We also installed all the required insulation and fire barriers as the building went up, finishing the brick façade in good time for the roofing team to complete their works.

In addition to the brick and block work, we also undertook the diamond drilling package. We drilled strategic holes to allow for utilities to be passed through the building to service the individual apartments. This project as a whole was slightly challenging due to the extensive drawing changes along the way, which led to a change of direction mid project. Regardless, with great teamwork between ourselves and the client, we managed to get back on track and the project progressed well.…

Read More